What you need to know about BIM

2017-10-17T14:39:09+00:00March 15th, 2016|

If you’re involved in the ‘bricks & mortar’ side of the building industry, be it design, specification, procurement, construction, facilities management etc. it’s fair to say that you’ll find yourself at the sharp end of BIM. Some practices have already picked up the baton and are actively introducing it as their preferred option.

 0

The Posh – Peterborough Football Stadium

2016-10-27T20:08:15+00:00October 16th, 2015|

flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy’s End Stand at Peterborough United football stadium. The project includes a 3000sqm specialist education centre, linked to the stand. The building was designed to reach a BREEAM excellent standard.

 0

flex7 Low Voltage Switch Unit

2016-10-27T20:08:15+00:00August 26th, 2015|

A simple, cost-effective way of complying with the 17th Edition Wiring Regulations (BS7671: 2008 Amendment No.3 Jan 2015).

 0

LSF vs LSHF – Do you know the difference?

2021-08-17T14:42:45+00:00August 26th, 2015|

Do you know the difference between LSF and LSHF cable? There is a worryingly common misconception that LSF cable (Low Smoke and Fume) and LSHF cable (Low smoke Halogen Free) are simply different names for the same thing.

 0

ESOS Deadline Looming

2017-10-17T14:41:55+00:00July 24th, 2015|

ESOS is the UK Energy Savings Opportunity Scheme. The mandatory energy assessment scheme applies to any UK company that has 250 or more employees, or has an annual turnover of more than €50 million.

 0