Plug-in Switches from flex7

2021-09-27T09:53:04+00:00May 4th, 2018|

flex7 have developed a unique range of plug-in switches that operate at Protected Extra Low Voltage (PELV) and offer the installer dramatic time savings. Switches are connected using a lead with RJ11 connectors, one end plugging into the switch, the other into the flex7 control pack or ZoneLite unit.

 0

Integrated Emergency Test – The benefits

2019-10-07T16:56:37+00:00October 13th, 2017|

flex7 lighting controls are available with the added benefit of integrated emergency test. This feature can save time during both installation, and when carrying out periodic testing. Our lighting controls can easily be networked together meaning that rather than testing each circuit or phase separately, you can simply use one master key switch to test emergency luminaires across multiple circuits or even phases.

 0

New Conference Room Scene Setting Kit

2018-05-04T11:54:17+00:00October 5th, 2017|

Our newest offering is the flex7 Scene Setting Kit for conference rooms. It offers a plug & play lighting connection and control solution that allows the user to set and recall 4 individual scenes. All products in the kit simply plug together, saving significant time on site, and reducing the need for skilled labour

 0

New July 2017 Cable Regulations – How will they affect the industry?

2017-10-17T14:32:47+00:00September 1st, 2017|

On July 1st 2017 a new and mandatory ruling with respect to making a cable’s fire related properties publically available came into force, but rather than diving straight into the specifics it may be more useful to start with something of an overview of how and why it came to be. The burning question (no pun intended) has to be whether there will be an immediate impact on the UK’s construction industry?

 0

Lighting connection & control products for education

2024-05-08T11:08:09+00:00March 24th, 2017|

Lighting controls for schools and universities - When designing the lighting scheme for a new or refurbished education setting, there are many things to consider including time constraints, regulations, energy-efficiency and special client requirements.

 0

New flex7 Scene Setting Panel

2019-08-01T07:28:46+00:00March 21st, 2017|

The wall-mounted panel allows you to set up 4 lighting scenes, and instantly recall them with the simple press of a button. If needed, scenes can be further adjusted while in use, by dimming up/down individual channels, to create a tailor made lighting scene.

 0

Changes to Scottish Energy-Efficiency Regulations

2017-10-17T14:35:30+00:00March 13th, 2017|

In September last year new regulations were brought into effect in Scotland. These regulations relate to the energy performance of large non-domestic buildings, and what can be done to improve them.

 0

Selecting lighting controls

2017-10-17T14:37:41+00:00August 25th, 2016|

Whatever the type of installation, be it a school, hospital, office or retail outlet, areas where luminaires are controlled by a simple switch on the wall are greatly outnumbered by those incorporating something a bit more.. involved. What should you consider before selecting lighting controls?

 0

Bicester Community Hospital

2022-11-29T11:04:58+00:00May 27th, 2016|

flex7 lighting connection and control products were installed throughout the £5m Bicester Community Hospital Development.

 0

Premier Oil Offices

2018-05-24T11:39:43+00:00May 11th, 2016|

flex7 modular lighting connection and control products were used in phase two of a prestigious business park near Aberdeen.

 0